Cora Construction Project Phase 1 Complete!

Today it was actually sunny, so of course time was spent outside. Floyd (and I) enjoyed a good morning walk. Mr Energy showed what a good boy he can be. He found a herd of elk and dashed after them, but he stopped and came when I called. We were both rather pleased with the day. With the fun done it was time to get serious and tackle CCP.

Before we could undertake phase 1, Cora got to practice walking down the temporary ramp and then was allowed to explore the yard (more about that in a bit). She covered more ground than I expected!

Phase 1 of Operation Cora Construction Project
-Fence the porch!

fenced-porch

I don’t have to worry about her falling under the railings or off the unrailed side. It’s quite a drop.

gated-porch

A gate!

Phase 2- Almost done– No pictures because it would be boring

Staining and cutting pieces for the ramp. The borrowed saw and I both ran out of juice

Phase 3-

Constructing the ramp! Will my design work? Stay Tuned.

And now we interrupt this program for a Coramercial

 

cora-vs-fern

Finally, Cora finds someone who stays still long enough, that she can fight it.

core-vs-ferns-tumble

Alas, even though her foe was a fern, Cora loses the battle. Tumbling away from her enemy she lives to fight another day.

6 thoughts on “Cora Construction Project Phase 1 Complete!”

  1. The picture of Cora surrounded by fern leaves is very, very adorable! She seems to be getting around real good. Can’t wait to see the completed project!

    1. Thanks. She isn’t fast and she doesn’t move in a straight line, but she certainly has no problem exploring her world. She was so dang cute with that fern.

Leave a Reply

Your email address will not be published. Required fields are marked *